our projects
Building Automation and Mechanical
a few of our Projects
Cold Lake Fish Hatchery Process and Building Automation Design Controls and Upgrades, Mechanical Integration, Prime Consultant
Reynolds Alberta Museum Building Automation Design & Upgrades, Prime Consultant
Stettler Provincial Building Boilers & Air Conditioning Upgrades, Prime Consultant
Wainwright Provincial Building Chiller and Condensing Unit Upgrades, Prime Consultant
Lewis Farms Recreation Centre, Building Automation Design – Controls,
Red Deer Courthouse Chiller Replacement Design, Controls Upgrade. Red Deer Remand Centre Prisoner Washroom Design.
Michener Centre Deakalizer Upgrade, Mechanical Upgrades, Recreation Centre HVAC Upgrades, Prime Consultant
Edmonton Downtown Public Library, Building Automation Controls Design,
Downtown MacEwan University Students Union Building SAMU Centre, Building Automation Controls Design,
Bonnyville High School, Building Automation Controls Design,
Ft Edmonton Park – Indigenous Experience Building Building Automation Controls Design,
![Building Automation](https://c3engineeringtechnology.com/wp-content/uploads/2019/10/multinetddcim0000512-1.jpg)
![Cold Lake Fish Hatchery](https://c3engineeringtechnology.com/wp-content/uploads/2019/10/RosecrestOct2012-011.jpg)
![Mechanical Integration](https://c3engineeringtechnology.com/wp-content/uploads/2019/10/RosecrestOct2012-009.jpg)
![Boiler Control](https://c3engineeringtechnology.com/wp-content/uploads/2019/10/RosecrestOct2012-006.jpg)
![New Chiller Wainwright](https://c3engineeringtechnology.com/wp-content/uploads/2019/10/2017-03-02-11.00.00.jpg)
![New Condenser](https://c3engineeringtechnology.com/wp-content/uploads/2019/10/2017-03-02-11.07.16.jpg)
![New Air Cooled Condenser](https://c3engineeringtechnology.com/wp-content/uploads/2019/10/2017-03-02-11.06.29.jpg)
![Prison Design & Retrofit](https://c3engineeringtechnology.com/wp-content/uploads/2019/10/2018-02-14-14.13.17.jpg)
![Condo Studies](https://c3engineeringtechnology.com/wp-content/uploads/2019/10/2019-01-29-17.04.18.jpg)
![Service Stations](https://c3engineeringtechnology.com/wp-content/uploads/2019/10/gas.jpg)
![Rooftop HVA](https://c3engineeringtechnology.com/wp-content/uploads/2019/11/2018-03-23-14.45.06.jpg)
![New Courthouse Chilller](https://c3engineeringtechnology.com/wp-content/uploads/2019/11/2017-11-24-14.31.19.jpg)
![Cold Lake Fish Hatchery](https://c3engineeringtechnology.com/wp-content/uploads/2019/10/rosecrestoct2012031-0.jpg)
![Efficient Boilers upgrade](https://c3engineeringtechnology.com/wp-content/uploads/2019/11/Good-Boiler-IMG_9090.jpg)
![Maintenance Guides](https://c3engineeringtechnology.com/wp-content/uploads/2019/10/vp.jpg)
![Condo Reserve Studies](https://c3engineeringtechnology.com/wp-content/uploads/2019/10/Entrance-Landscaping-2018-08-13-15.31.05.jpg)
![Provincial Controls](https://c3engineeringtechnology.com/wp-content/uploads/2019/10/img_4489-0.jpg)
![Cogeneration](https://c3engineeringtechnology.com/wp-content/uploads/2019/02/architecture-bridge-building-280490.jpg)
Photos of some of our projects
HVAC Mechanical Design, Condo Studies, Building Controls, Mechanical Assessments, Prisons, Maintenance Planning, Retrofit Design.
Click small buttons below the photos to scroll through photos